-
Geometric Power & GE signing the EPC contract for the OMA Power Project with CMEC at the State House China on October 14, 2016
- 15/10/2016
- Posted by: admin
- Category: News
No Comments -
FG resolves Aba ring-fenced dispute in favour of Geometric/Aba Power
- 02/04/2016
- Posted by: admin
- Category: Partners
-
Powering Africa Summit, Washington DC – 2016
- 18/02/2016
- Posted by: admin
- Category: News