- 16/04/2014
- Posted by: admin
- Category: News
A former Minister of power, Professor Barth Nnaji and some of the new owners of the distribution company yesterday, declared that Nigerians power generating facility are obsolete and unreliable.
They however, suggested embedded generation as short term solution to the current energy challenges in the country.
Speaking at the seventh Lagos state Economic Summit (Ehingbeti 2014) Nnaji disclosed that there was a wide gap between electricity supply and demand, while the transmission infrastructures are weak and inadequate.
He further stated that the distribution network was over loaded, while the rates of technical and commercial losses are very high.
Nnaji suggested and embedded generation using the ring-fencing method whereby areas are divided into economic clusters, as the short term solution for the power deficit in the country.
Please visit the below links for more information:
http://businessnews.com.ng/2014/04/10/nnaji-stakeholders-decry-poor-state-power-infrastructure/
Howdy! Do you know if they make any plugins to assist with Search Engine Optimization? I’m
trying to get my blog to rank for some targeted keywords but I’m not seeing very good gains.
If you know of any please share. Cheers! You can read similar art here: Escape rooms hub
Great post and right to the point. I am not sure if this is in fact the best place to ask but do you people have any thoughts on where to
hire some professional writers? Thx 🙂 Lista escape room
I like this blog very much, Its a really nice situation to read and obtain info.!
Your point of view caught my eye and was very interesting. Thanks. I have a question for you.
Thanks for sharing. I read many of your blog posts, cool, your blog is very good.
Your article helped me a lot, is there any more related content? Thanks!
Your article helped me a lot, is there any more related content? Thanks!